Project details
Client
ZM Architecture
Tim Clark
0141 572 1669
tim@zmarchitecture.co.uk
Value
£245,000
Duration
September 2019 – February 2020
Conditions of Contract
SBCC Minor Building Works Contract with Contractor’s Design
WHK Team
Robert Macnaughton
Fiona Rodden
John Cairns
Michael Pellicci
Building Safety Group Ltd
Client Team
David Narro Associates
McLeman QS Network
Project Benefits
1 Local SME Subcontracted
1 Local Material Supplier
1 Local Plant Supplier
Overview
Carried out under the Conservation Area Regeneration Scheme (CARS) we undertook repair work to the roof and external elevations of the building, which is occupied by residents on the upper levels and a commercial business operating on the ground floor.
Scope of work
- Slate roof works
- Lead work
- Chimney repair/rebuild
- Masonry and stone repairs
- Replacement of cast-iron rainwater goods
- Select window repairs
Internal works were necessary to remedy the rot and timber damage uncovered during the works
With occupants in all levels of the building and general public access to the ground floor shop, our team took meticulous care to ensure occupier safety and security of their property, as well as maintaining safe access for pedestrians.